UNISPORT designed, manufactured and installed two panoramic padel courts for a new padel club in Guangzhou, China. Both courts are built to FIP-standard court dimensions (10 m × 20 m), and both were playable three days after the concrete foundation was handed over.
| Item | Detail |
| Courts delivered | 2 × panoramic padel court, 10 m × 20 m |
| Location | Guangzhou, Guangdong, China |
| Contractor | UNISPORT — GUANGZHOU UNISPORT FACILITIES CO., LTD |
| Court assembly time | 3 days, from foundation handover to first serve |
| Court surface | Italian Mondo professional padel turf |
| Structure | Hot-dip galvanized steel frame |
| Walls | 12 mm tempered safety glass + high-strength mesh |
| Lighting | 200 W LED, four-post layout |
| Scope | Design, manufacture, export packing, installation, after-sales |
| Standard | FIP-standard court dimensions and equipment layout |
1. Preparation at the factory, before anything ships
Steel posts, mesh panels and connection hardware were cut, drilled and hot-dip galvanized in the factory. Turf was cut to the 10 m × 20 m layout with the line positions already marked, so no measuring or cutting was needed on site. Glass was packed in pre-drilled wooden crates in installation order.
2. Site work: assembly, not construction
With a finished concrete slab on site, the sequence ran: anchor and level the posts → erect the steel frame → hang mesh and glass → lay the pre-cut turf → fill and brush in silica sand → mark the lines → install the centre net and lighting → lighting and safety check with the operator.
3. Why the third day was possible
Two crews worked in parallel on the two courts, and every material arrived cut to size. The three days describe the court assembly phase only — the concrete foundation and site preparation happen before that, and their duration depends on your site.

• Court design and layout for the site, including access positions and the arrangement of the two courts
• Manufacture of the steel frame, mesh, glass specification, turf and lighting
• Export packing, shipping documentation and delivery to site
• On-site assembly of both courts, line marking, and acceptance with the operator
• After-sales support after handover
• The concrete slab or asphalt base, and any civil works around it
• Local permits, building approval and site access arrangements
• Club fit-out (lockers, reception, vending, furniture). We can offer supporting club facilities services, but they are not included by default. If necessary, please specify.
Prefabrication, planned around the install sequence
Core items — steel, mesh, glass, turf — were prepared in the factory to standard dimensions, then packed in the order they would be installed. The goal is not "prefabricated" as a slogan, but that nothing on site needs cutting, drilling or re-measuring.
A crew that has done the same sequence before
UNISPORT's installation teams work on padel courts regularly. Familiarity with the sequence is what removes errors: the frame is levelled once, glass goes in without re-packing, and turf goes down on the first attempt.
One point of contact from order to acceptance
Design confirmation, export packing, shipping, site installation and the final lighting check were run by the same UNISPORT team. There was no handover between a sales office and an installation contractor.
A padel court playing area is 10 m × 20 m. The end walls are 4 m high (approximately 3 m glass plus 1 m mesh above), and the side walls are stepped between 3 m and 4 m. UNISPORT builds to these dimensions, and custom sizes are available where a site cannot accommodate the standard layout.
Hot-dip galvanized steel is the standard choice for the frame because it resists rust in outdoor conditions. For the surface, a texturised monofilament turf with a PP and SBR backing keeps ball bounce consistent and drains well in rain. Glass should be 12 mm tempered safety glass.
Court assembly on this project took three days for two courts, with the slab already complete. A full turnkey delivery is longer, because manufacture, sea freight and customs sit in front of the site phase. Most standard courts are installed in 10–15 days on site, depending on site conditions and customisation.
Yes. Courts are packed for container shipping, with glass in pre-drilled wooden crates and turf pre-cut to the court layout. UNISPORT ships worldwide and can either send an installation team or support your local contractor with drawings and step-by-step guidance.
Yes, provided the slab is flat, structurally sound and drains properly. A common failure is a slab with insufficient slope or no drainage path, which shows up as standing water at the court edge after heavy rain. The slab is checked before the frame is anchored.
A classic court has corner posts inside the playing view. A panoramic court removes those posts so the glass walls run uninterrupted, which improves spectator sightlines and looks cleaner in photographs and broadcast. This project used panoramic courts.
Check four things, in this order: (1) whether the company manufactures the frame, glass specification and turf itself or resells third-party components; (2) a list of real, named projects you can verify; (3) export experience and shipping documentation; (4) what happens after delivery — spare parts, warranty terms and response time. UNISPORT can provide all four.
The main cost variables are the number of courts, the court type (classic, panoramic or fully panoramic), whether the courts are roofed, the lighting class, and freight and duty to your country.
Yes. The two courts on this project were finished in colours specified by the club — one green, one purple — while the frames, posts and mesh stayed standard black. Club logos can be applied to glass and signage.
UNISPORT offers 24/7 online service and provides a 4-year warranty. Courts are supported after handover with replacement parts and technical guidance on turf maintenance and glass inspection.