2 Panoramic Padel Courts in 3 Days | Guangzhou - GZUNISPORT
We use cookies to improve your online experience. By continuing browsing this website, we assume you agree our use of cookies.

UNI - Padel Club in China

Item No.: 00407
Two panoramic padel courts, designed and delivered by UNISPORT in Guangzhou, China — 10 m × 20 m to FIP-standard dimensions, assembled in three days.
Description Advantge FAQ Review
Description

Padel Club in China: Two Panoramic Courts Delivered in Three Days

UNISPORT designed, manufactured and installed two panoramic padel courts for a new padel club in Guangzhou, China. Both courts are built to FIP-standard court dimensions (10 m × 20 m), and both were playable three days after the concrete foundation was handed over.

Project at a glance

 Item  Detail
 Courts delivered  2 × panoramic padel court, 10 m × 20 m
 Location  Guangzhou, Guangdong, China
 Contractor  UNISPORT — GUANGZHOU UNISPORT FACILITIES CO., LTD
 Court assembly time  3 days, from foundation handover to first serve
 Court surface  Italian Mondo professional padel turf
 Structure  Hot-dip galvanized steel frame
 Walls  12 mm tempered safety glass + high-strength mesh
 Lighting  200 W LED, four-post layout
 Scope  Design, manufacture, export packing, installation, after-sales
 Standard  FIP-standard court dimensions and equipment layout

How two courts were assembled in three days

1. Preparation at the factory, before anything ships

Steel posts, mesh panels and connection hardware were cut, drilled and hot-dip galvanized in the factory. Turf was cut to the 10 m × 20 m layout with the line positions already marked, so no measuring or cutting was needed on site. Glass was packed in pre-drilled wooden crates in installation order.

2. Site work: assembly, not construction

With a finished concrete slab on site, the sequence ran: anchor and level the posts → erect the steel frame → hang mesh and glass → lay the pre-cut turf → fill and brush in silica sand → mark the lines → install the centre net and lighting → lighting and safety check with the operator.

3. Why the third day was possible

Two crews worked in parallel on the two courts, and every material arrived cut to size. The three days describe the court assembly phase only — the concrete foundation and site preparation happen before that, and their duration depends on your site.

2 Panoramic Padel Courts in 3 Days | Guangzhou

Advantge

UNISPORT Advantages

In scope

• Court design and layout for the site, including access positions and the arrangement of the two courts
• Manufacture of the steel frame, mesh, glass specification, turf and lighting
• Export packing, shipping documentation and delivery to site

• On-site assembly of both courts, line marking, and acceptance with the operator
• After-sales support after handover

Out of scope

• The concrete slab or asphalt base, and any civil works around it
• Local permits, building approval and site access arrangements
• Club fit-out (lockers, reception, vending, furniture).  We can offer supporting club facilities services, but they are not included by default. If necessary, please specify.

Why the site phase was short

Prefabrication, planned around the install sequence

Core items — steel, mesh, glass, turf — were prepared in the factory to standard dimensions, then packed in the order they would be installed. The goal is not "prefabricated" as a slogan, but that nothing on site needs cutting, drilling or re-measuring.

A crew that has done the same sequence before

UNISPORT's installation teams work on padel courts regularly. Familiarity with the sequence is what removes errors: the frame is levelled once, glass goes in without re-packing, and turf goes down on the first attempt.

One point of contact from order to acceptance

Design confirmation, export packing, shipping, site installation and the final lighting check were run by the same UNISPORT team. There was no handover between a sales office and an installation contractor.

Design note: why the two courts do not look the same

The two courts stand as a pair on a concrete slab inside a commercial park, with a public road running along one side. Three details decide how the installation reads, and none of them were left to chance.
Colour was the club's call, and it stops at the ground. The club specified the colours — one court green, one purple. Frames, posts and mesh are standard stock items and stay black, so colour is carried by the turf and nothing else. From the road, the installation reads as two clean blocks of colour instead of a set of coloured components bolted together.
One aisle serves both courts. The two courts were built as a pair around a single shared aisle — the same passage brings players and staff in to either court. It is as narrow as it is because the usable width of the slab was fixed, so the two structures were set up close together rather than spread apart.
Heights follow the standard. Glass and mesh heights are set to FIP-standard court geometry. The frame feet are anchored into an existing concrete slab, so there was no excavation phase on this site.
 Keeping the lower enclosure in glass and putting welded mesh only above it serves the club the same way: from the road, the courts advertise themselves.

One-stop padel court delivery

If you need the full component list and the system-level specification — turf, glass, posts, mesh, lighting, accessories — see our padel court system page. For projects outside China, the same system is delivered as a turnkey package: talk to us about your site.

Visiting the courts in Guangzhou

The courts are in Guangzhou, Guangdong, China. UNISPORT built them; the club runs bookings and day-to-day play. If you are looking for a court to play on in Guangzhou, please contact the club. If you are planning a padel venue of your own, the specification and build sequence above are the parts UNISPORT can repeat for you.

Planning your own padel club? Start here

Court assembly on this project took three days once the base was ready. A turnkey project is longer: foundation and civil works, manufacture, sea freight and customs all sit in front of those three days.

What actually drives the price

Four variables decide most of the budget: the number of courts; court type (classic, panoramic or fully panoramic); whether a roof is required; and the lighting class you need for evening play.
You May Also Need
Padel court roofing: what to check before you build a roofed court → Padel Court Roofing — The 6 Design Decisions That Decide Build Cost
What is included in a full padel court system → Padel Court System
FAQ

FAQ

1. What are the international standard dimensions for a padel court?

A padel court playing area is 10 m × 20 m. The end walls are 4 m high (approximately 3 m glass plus 1 m mesh above), and the side walls are stepped between 3 m and 4 m. UNISPORT builds to these dimensions, and custom sizes are available where a site cannot accommodate the standard layout.

2. What materials are recommended for outdoor padel courts?

Hot-dip galvanized steel is the standard choice for the frame because it resists rust in outdoor conditions. For the surface, a texturised monofilament turf with a PP and SBR backing keeps ball bounce consistent and drains well in rain. Glass should be 12 mm tempered safety glass.

3. How long does it take UNISPORT to build a padel court?

Court assembly on this project took three days for two courts, with the slab already complete. A full turnkey delivery is longer, because manufacture, sea freight and customs sit in front of the site phase. Most standard courts are installed in 10–15 days on site, depending on site conditions and customisation.

4. Do you ship and install padel courts outside China?

Yes. Courts are packed for container shipping, with glass in pre-drilled wooden crates and turf pre-cut to the court layout. UNISPORT ships worldwide and can either send an installation team or support your local contractor with drawings and step-by-step guidance.

5. Can a padel court be installed on an existing concrete slab?

Yes, provided the slab is flat, structurally sound and drains properly. A common failure is a slab with insufficient slope or no drainage path, which shows up as standing water at the court edge after heavy rain. The slab is checked before the frame is anchored.

6. What is the difference between a classic and a panoramic padel court?

A classic court has corner posts inside the playing view. A panoramic court removes those posts so the glass walls run uninterrupted, which improves spectator sightlines and looks cleaner in photographs and broadcast. This project used panoramic courts.

7. How do I choose a reliable Chinese padel court manufacturer?

Check four things, in this order: (1) whether the company manufactures the frame, glass specification and turf itself or resells third-party components; (2) a list of real, named projects you can verify; (3) export experience and shipping documentation; (4) what happens after delivery — spare parts, warranty terms and response time. UNISPORT can provide all four.

8. What does a padel club project cost?

The main cost variables are the number of courts, the court type (classic, panoramic or fully panoramic), whether the courts are roofed, the lighting class, and freight and duty to your country.

9. Can you customise the court colour and add our club branding?

Yes. The two courts on this project were finished in colours specified by the club — one green, one purple — while the frames, posts and mesh stayed standard black. Club logos can be applied to glass and signage.

10. What warranty and after-sales support do you provide?

UNISPORT offers 24/7 online service and provides a 4-year warranty. Courts are supported after handover with replacement parts and technical guidance on turf maintenance and glass inspection.

Review
Valentina
Jun 10, 2025
Perfect!
Review

ver_code
1/3
X
Send your message to us