Track and Field

How long does it take to build an outdoor track?
The normal construction period takes one month from the beginning to the end, and the steps are from inspection, plan making, construction start, track test, and completion. Generally, a team of about 10-15 people is needed to complete it. It will take about the same time if the weather permits, and if it is rainy, the cycle will definitely be extended.

How long do Athletics Stadium Tracks last?
Generally, after our professional manufacturers provide materials for export and install EPDM plastic track, the service life can be between 7-10 years. The service life of different types of athletic tracks is also different. Spray coat running track can generally be used for 7-8 years; mixed casting running track can be used for 8-9 years; full PU running track can be used for more than ten years. In fact, if ourathletic track is well maintained, or the materials used are of high quality, the service life of the athletic track will naturally increase.

How much would a track cost?
Generally, investors need to spend between 400,000 and 1.2 million US dollars to build a running track. Different athletic tracks have different materials, and factors such as freight, cost, labor costs, and geographical location are also included. The better the material, the lower the cost. With more knowledge, GZUNISPORT specializes in providing customized athletic track services to meet customer needs.

How to make 400m athletic track?
The official international standard track and field track requirements are as follows:
Firstly, the athletic track is divided into two semicircles with a radius of about 36.5m; outside the semicircle, it is divided into two straight lines with a radius of about 84.5m. There are 8-10 straight tracks, and about 8 curves. A 100-meter starting point and a 110-meter hurdle starting point should be installed on the west side of the straight track;

some professional shot put, high jump and other projects can be set up at the center points of the two semicircles, and the center of the venue must be our football field (you can swipe your phone to jump to the one-stop service page of the football field to watch). This is a professional athletic track production concept. If you want to customize a smaller one, you can also scale it down according to the same proportion.
What kind of material is used more in track and field track?
It must be the EPDM rubber particles produced by ourselves. EPDM is the most preferred plastic track. We produce a lot of colorful, non-toxic, tasteless, and environmentally friendly EPDM. Due to the diversity of EPDM, it is very suitable for investors to design patterns on the track. Nowadays, EPDM is basically used in the production of running tracks, because it is extremely durable, requires little maintenance, and the construction does not have a high eyeball for the floor, and construction can be started directly on most grounds.

How do we make Athletics Tracks?
Professional track and field sports tracks have certain special properties, and it is necessary to sort out the overall planning and time before construction, so as not to make mistakes. The overall athletic track construction is mainly divided into two stages: base construction and surface construction.
Base construction means we need to lay a good foundation for our athletic track. By grinding and compacting the overall plane, the method is to smooth the uneven ground, pour a certain space, and add a protective film, so as to have a durable effect. The final excavation is to increase a certain degree of adhesion and elasticity, so that athletes are not easy to sprain when running.

Then there is the construction of the surface. After the foundation is built, the surface needs to be paved with materials, and our waterproof primer and some floor paints are added to make it fixed for a certain period of time. Then through the operation of the machine (paver, heating rollerbinder,etc). to make the whole average), and finally need to add a marking machine to make the runway standard for the athletic track, all the steps here must be very professional and careful, and finally the athletic track needs to be tested after construction , if it is not perfect, it can be adjusted in time.
It takes a certain amount of time and patience to customize a professional and long-term use of the athletic track, we have very successful cases for your reference, welcome to consult us.